AI DATA CENTERS HAVE

By 2030, AI demand outpaces supply by 100 gigawatts.

Scroll
The wall AI keeps hitting

The AI infrastructure buildout is hitting four walls at once.

01  ยท  Power

A seven-year wait just to reach the grid.

In the world's largest market, new data centers now sit in a seven-year connection queue, for power the grid may never free up. In Ireland, the operator stopped connecting them at all.

02  ยท  Water

The water comes back polluted.

Amazon paid $20.5 million over data center wastewater that reached residents' wells. Elsewhere, regulators are weighing permits to let cooling systems dump forever chemicals into public water.

03  ยท  Public pushback

$156 billion of projects, blocked in a single year.

Seven in ten Americans now oppose a data center anywhere near them. In 2025 the backlash went national, stalling projects across the country.

04  ยท  Permits

Governments are blocking new permits.

New York became the first state to halt new data center permits, and more than a hundred towns have their own bans. In Alberta, the regulator just killed the country's largest proposed campus.

AI is 100 GW short of the grid

Before SupraCircle, every fix hit the same four walls.

Google ยท Hyperscale cloud
Water
A Chilean court revoked Google's Santiago permit over the 7.6 million liters a day it would pull from a strained aquifer. The project starts over.
Data Center Dynamics โ†—
Amazon ยท Project Blue
Water
Tucson's council unanimously rejected the Amazon-linked hyperscale campus over its water use. Amazon walked away.
Fox Business โ†—
Synapse ยท AI megacampus
Permits
Alberta's regulator killed this $10 billion, 1.4 GW campus in Olds, citing deficiencies and no real engagement with residents.
Data Center Dynamics โ†—
xAI ยท Colossus
Pushback
xAI is being sued in Memphis for powering Colossus with 27 unpermitted gas turbines, pumping toxic pollution into a nearby community.
CNBC ยท NAACP lawsuit โ†—
So the boldest idea leaves Earth

Put the data centers in space.

It escapes all four walls, then runs into two new ones.

Cost
$205B
to reach three gigawatts
Speed
2034
a decade before it is ready
Introducing

SupraCircle Compute

Without the grid. Without a drop of fresh water.

Good for the environment. Good for governments. Good for communities.

0 3 6 9 GIGAWATTS 2026 2030 2034 SupraCircle Data centers in space 3 GW by 2030 9 GW 90 MW 3 GW by 2034
Capital to reach the same 3 gigawatts
SupraCircle
$89B
In space
$205B

Leave us a note.

We look forward to connecting with you.

โ—

You're on the list.

Check your inbox for a note from us. We'll be in touch.